Sucker Rod / Beam Pumping Systems
Have Questions ?
Sucker Rod / Beam Pumping Systems - PE-SRP-PEA27
| Code | Date | Time | Duration | Location | Currency | Early Bird Fee Per Person |
|---|---|---|---|---|---|---|
| PE-SRP-PEA27 | 03 - 07 May 2027 | 10 AM CST | 4 Hours Per Day |
Online |
USD |
3000 |
Need this for a group? We deliver the same course in-house — face-to-face at your location or online — tailored to your assets and team level. Contact info@peassociations.com.
Boost your team's skills and your budget! Enjoy group discounts for collaborative learning. Send an inquiry to info@peassociations.com.
Sucker Rod Beam Pumping Systems
Description
Sucker rod pumping lifts more wells than any other method. It is mechanically simple, well understood and cheap to operate, but it is also the lift method where poor design shows up most quickly, in parted rods, worn tubing, failed pumps and wells that pound fluid. This course covers the complete system: prime mover, gearbox, pumping unit, polished rod, rod string, tubing and subsurface pump.
Participants work through pumping unit geometry, stroke length and speed, counterbalance and torque, rod string design and loading, and subsurface pump selection and sizing, including plunger size, fit and valve arrangement. The course then covers gas interference, solids and viscous crude, pump-off control and variable speed operation, and dynamometer cards as the primary diagnostic tool. It closes with failure analysis of rods, pumps and tubing and with the practices that improve run life.
A beam pump is a machine that lifts a column of fluid with a long, slender steel string in tension and compression thousands of times a day. Everything about its performance follows from that. Rod loading, fluid load, buoyancy, friction and acceleration set the peak and minimum polished rod loads; gearbox torque and counterbalance set the load on the surface equipment; and the pump fillage sets how much of each stroke actually produces fluid.
Most operating problems have clear signatures. Gas interference, fluid pound, worn plungers, stuck valves, parted rods and tubing movement each produce characteristic dynamometer cards. An engineer who can read these cards can diagnose most well problems from surface without pulling the well, which is why dynamometry is central to rod pump surveillance.
Common mistakes include oversizing the pump so the well pounds fluid, designing rod strings without checking loading and buckling, ignoring counterbalance and gearbox torque limits, and running pumped-off wells without pump-off control. Each shortens run life and costs workovers. The course focuses on getting the design right and using surveillance data to keep it right.
By the end of this training, participants will be able to:
- Describe the components of a sucker rod pumping system and their functions.
- Calculate pump displacement, stroke length, speed and expected production.
- Design rod strings and check peak and minimum polished rod loads.
- Select and size subsurface pumps, including plunger size, fit and type.
- Calculate counterbalance, gearbox torque and power requirements.
- Assess and manage gas interference, solids and viscous crude.
- Apply pump-off control and variable speed operation.
- Interpret surface and downhole dynamometer cards to diagnose well and equipment problems.
- Analyse rod, pump and tubing failures and apply the findings to improve run life.
Organisations sending participants to this training will:
- Get rod pump designs matched to well inflow, reducing fluid pound and equipment damage.
- Improve run life and reduce rod, pump and tubing failures.
- Diagnose well problems from surface data before pulling the well.
- Reduce energy consumption through better counterbalance and pump-off control.
- Build a failure analysis process that feeds back into design.
Participants will:
- Understand how a beam pump system works as a whole.
- Be able to design and check a rod string and pump for a given well.
- Be able to read dynamometer cards and diagnose problems from them.
- Understand gas interference and how to manage it.
- Be able to carry out and use rod pump failure analysis.
- Production engineers
- Artificial lift engineers
- Well operations engineers and supervisors
- Field technicians and pumpers
- Production technologists
- Maintenance engineers supporting rod pumped fields
Module 1: Rod Pumping System Overview
- System components from prime mover to subsurface pump
- Applications and operating envelope
- Comparison with other lift methods
Module 2: Pumping Units
- Unit geometry: conventional, air balanced and Mark II
- Stroke length and pumping speed
- Counterbalance and torque
- Prime movers and gearboxes
Module 3: Subsurface Pumps
- Tubing and rod pumps
- Plunger size, fit and materials
- Standing and travelling valves
- Pump displacement and volumetric efficiency
- Anchors and seating assemblies
Module 4: Rod String Design
- Rod grades, sizes and tapered strings
- Fluid load, buoyancy and dynamic loads
- Peak and minimum polished rod loads
- Rod buckling and sinker bars
- Fatigue and the modified Goodman diagram
Module 5: System Design Calculations
- Matching pump displacement to well inflow
- Predicting production and pump fillage
- Power and torque requirements
- Design for changing well conditions
Module 6: Gas, Solids and Viscous Crude
- Gas interference and gas separation
- Gas anchors and pump intake placement
- Sand and solids handling
- Viscous and heavy crude considerations
Module 7: Pump-Off Control and Variable Speed
- Fluid pound and its consequences
- Pump-off controllers
- Variable speed drives
- Setting control parameters
Module 8: Dynamometry
- Surface and downhole cards
- Card shapes for normal operation
- Gas interference, fluid pound and gas lock signatures
- Worn pumps, stuck valves, parted rods and tubing movement
- Using cards for routine surveillance
Module 9: Failure Analysis and Run Life
- Rod failures and their causes
- Pump wear and failure
- Tubing wear and rod-on-tubing contact
- Corrosion, scale and paraffin effects
- Failure reporting and run life improvement
Upon successful completion of this training course, delegates will be awarded an official Certificate of Completion issued by the Petroleum Engineers Association (PEA), an ISO 9001:2015 certified training organization. The certificate carries 10 Credits and formally records the total learning hours completed.
Each certificate is signed by the Course Facilitator and the CEO of the Petroleum Engineers Association, and serves as verifiable proof of professional training that delegates can present to employers and professional bodies worldwide.
Frequently Asked Questions
All course bookings made through PEA are strictly non-refundable. By registering for a course, you acknowledge and accept that all fees are payable in full and are not subject to refund under any circumstances, including changes in personal or professional commitments or partial attendance.
PEA reserves the right to make reasonable adjustments to course content, trainers, or schedules where necessary, without entitling delegates to a refund. Comprehensive details of each course — including objectives, target audience, and content — are clearly outlined before enrolment, and it is the responsibility of the delegate to ensure the course's suitability prior to booking.
For any inquiries related to cancellations or bookings, please contact our support team, who will be happy to assist you.