Well Abandonment & P&A Operations
Have Questions ?
Well Abandonment & P&A Operations - PE-WPA-PEA27
| Code | Date | Time | Duration | Location | Currency | Early Bird Fee Per Person |
|---|---|---|---|---|---|---|
| PE-WPA-PEA27 | 22 - 26 Nov 2027 | 10 AM CST | 4 Hours Per Day |
Online |
USD |
3000 |
Need this for a group? We deliver the same course in-house — face-to-face at your location or online — tailored to your assets and team level. Contact info@peassociations.com.
Boost your team's skills and your budget! Enjoy group discounts for collaborative learning. Send an inquiry to info@peassociations.com.
Well Abandonment & P&A Operations
Description
Abandonment is the last operation in a well's life and the one whose results must last indefinitely. The objective is permanent isolation of every flow path that could allow hydrocarbons or formation fluid to reach another formation, a freshwater aquifer or the surface. Regulators, liabilities and decommissioning budgets have made this a major activity in mature basins.
This course covers the work from planning to verification. It starts with the regulatory framework and barrier philosophy, then covers well integrity assessment and the data needed before planning, including cement bond evaluation and annulus condition. It then covers cement plug design and placement methods, annulus isolation, casing cutting, pulling and section milling, and alternative barrier materials. The course closes with barrier verification and testing, wellhead and conductor removal, suspension and temporary abandonment, cost estimation, and campaign planning across multiple wells.
A permanently abandoned well must isolate every potential flow path: inside the casing, in the annuli behind each string and through any damaged or poorly cemented section. Barriers are required across each permeable hydrocarbon-bearing zone and at surface, and each must extend across the full cross-section of the well, which includes the annuli. Regulatory frameworks differ in detail, but they agree on that principle.
The difficulty is that the well was not built to be abandoned. Cement behind casing may be absent or channelled, annuli may be pressurised, tubing may be corroded or stuck, and records from decades ago may be incomplete. The work of establishing full cross-sectional barriers often means cutting and pulling casing, section milling, perforating and squeezing, or placing barriers through tubing, each of which adds rig time and cost.
Abandonment is also an operation with no production upside, which creates pressure to do it cheaply. That pressure is worth resisting: an abandonment that leaks becomes a long-term liability, and re-entering an abandoned well costs several times what doing it properly would have cost. Campaign planning, standardised procedures and rigless techniques are the legitimate ways to reduce cost. This course covers both the technical requirements and the cost management.
By the end of this training, participants will be able to:
- Describe regulatory requirements and barrier philosophy for well abandonment.
- Assess well integrity and gather the data needed for abandonment planning.
- Evaluate cement behind casing and identify barrier gaps.
- Design cement plugs, including length, placement and setting requirements.
- Select placement methods, including balanced plug, dump bailer and through-tubing techniques.
- Plan annulus isolation using perforate and squeeze or section milling.
- Plan casing cutting, pulling and recovery operations.
- Verify and test barriers to the required standard.
- Plan wellhead and conductor removal and site restoration.
- Estimate abandonment cost and plan multi-well campaigns.
Organisations sending participants to this training will:
- Meet regulatory abandonment requirements reliably.
- Reduce the risk of leaking abandoned wells and long-term liability.
- Reduce abandonment cost through campaign planning and rigless techniques.
- Improve the quality of abandonment programmes and barrier verification.
- Improve decommissioning cost estimates and provisioning.
Participants will:
- Understand abandonment barrier requirements and the reasoning behind them.
- Be able to assess a well and plan its abandonment.
- Be able to design and place cement plugs.
- Understand annulus isolation, cutting and milling operations.
- Be able to estimate abandonment cost and plan campaigns.
- Well intervention and abandonment engineers
- Well integrity engineers
- Drilling and completion engineers
- Production engineers in mature fields
- Decommissioning project engineers
- Operations engineers and supervisors
Module 1: Abandonment Requirements
- Objectives of permanent abandonment
- Regulatory frameworks and industry guidelines
- Barrier philosophy and cross-sectional isolation
- Permanent and temporary abandonment
- Liability and long-term integrity
Module 2: Well Assessment and Data Gathering
- Well records and as-built data
- Reservoir and formation pressure review
- Annulus pressure history
- Casing and tubing condition
- Identifying potential flow paths
Module 3: Cement Evaluation Behind Casing
- Cement bond and ultrasonic logs
- Interpreting bond quality and channelling
- Identifying barrier gaps
- Logging through tubing
Module 4: Cement Plug Design
- Plug length and placement requirements
- Cement systems for abandonment
- Setting and curing
- Plug integrity requirements
- Alternative barrier materials
Module 5: Plug Placement Methods
- Balanced plug technique
- Dump bailer placement
- Two-plug and cement retainer methods
- Through-tubing placement
- Common placement failures
Module 6: Annulus Isolation
- Perforate, wash and cement
- Squeeze cementing
- Section milling
- Casing expansion and alternative methods
- Verifying annular isolation
Module 7: Casing Cutting and Recovery
- Cutting methods: mechanical, chemical, abrasive and explosive
- Casing pulling and recovery
- Stuck casing and contingency
- Handling recovered tubulars
Module 8: Verification and Testing
- Pressure testing barriers
- Tagging and weight testing plugs
- Logging verification
- Documentation and regulatory reporting
Module 9: Wellhead Removal and Site Restoration
- Wellhead and conductor cutting and removal
- Seabed and surface clearance requirements
- Site restoration
- Final abandonment documentation
Module 10: Cost and Campaign Planning
- Cost drivers in abandonment
- Rigless and light intervention abandonment techniques
- Batch and campaign planning across wells
- Scheduling and logistics
- Cost estimating and provisioning
Upon successful completion of this training course, delegates will be awarded an official Certificate of Completion issued by the Petroleum Engineers Association (PEA), an ISO 9001:2015 certified training organization. The certificate carries 10 Credits and formally records the total learning hours completed.
Each certificate is signed by the Course Facilitator and the CEO of the Petroleum Engineers Association, and serves as verifiable proof of professional training that delegates can present to employers and professional bodies worldwide.
Frequently Asked Questions
All course bookings made through PEA are strictly non-refundable. By registering for a course, you acknowledge and accept that all fees are payable in full and are not subject to refund under any circumstances, including changes in personal or professional commitments or partial attendance.
PEA reserves the right to make reasonable adjustments to course content, trainers, or schedules where necessary, without entitling delegates to a refund. Comprehensive details of each course — including objectives, target audience, and content — are clearly outlined before enrolment, and it is the responsibility of the delegate to ensure the course's suitability prior to booking.
For any inquiries related to cancellations or bookings, please contact our support team, who will be happy to assist you.