Well Control for Production & Intervention Operations
Have Questions ?
Well Control for Production & Intervention Operations - PE-WCP-PEA27
| Code | Date | Time | Duration | Location | Currency | Early Bird Fee Per Person |
|---|---|---|---|---|---|---|
| PE-WCP-PEA27 | 27 - 31 Dec 2027 | 10 AM CST | 4 Hours Per Day |
Online |
USD |
3500 |
Need this for a group? We deliver the same course in-house — face-to-face at your location or online — tailored to your assets and team level. Contact info@peassociations.com.
Boost your team's skills and your budget! Enjoy group discounts for collaborative learning. Send an inquiry to info@peassociations.com.
Well Control for Production & Intervention Operations
Description
Well control in production and intervention differs from drilling. The well is usually live, the completion is in place, tools or pipe may be in the hole on a line or coiled tubing, and the pressure control equipment is different for every method. The principles are the same, but the procedures, equipment and failure modes are not.
This course covers those differences. It starts with pressure fundamentals, formation and fracture pressure, and the two-barrier principle as it applies to live well work. It then covers kick causes and detection during production operations, wireline, coiled tubing, snubbing and workover activities, followed by the pressure control equipment used in each and its testing requirements. The course then covers shut-in procedures and kill methods, including bullheading, lubricate and bleed, circulating kills and the use of kill fluids, and closes with special problems such as gas migration, hydrate formation during kills, hydrogen sulphide, and emergency response and well control incident management.
A live well operation begins with pressure at the wellhead and tools or pipe passing through a pressure control stack. The barriers that keep the well contained are mechanical and in use continuously, unlike drilling where the fluid column does most of the work. If a stripper leaks, a ram fails to seal or a check valve does not hold, the situation develops immediately and with pipe or wire in the well.
Detection is also different. There is no flow check against a mud pit. Signs come from annulus pressures, tubinghead pressure behaviour, unexpected flow at surface, weight changes and equipment response. Operators need to know what normal looks like on that specific well in order to recognise abnormal, which is why well-specific pressure data is part of the job programme.
Kill methods are constrained by what is in the hole and what the formation can take. Bullheading forces fluid into the formation and risks damaging it or fracturing the shoe. Lubricate and bleed is slow but gentle. Circulating requires a path, which may not exist. Choosing the method before it is needed, and writing it into the programme with the fluids and equipment on site, is what separates a controlled event from an emergency.
By the end of this training, participants will be able to:
- Apply pressure fundamentals to production and intervention operations.
- Explain barrier requirements and verify barriers during live well work.
- Identify kick causes and warning signs during production and intervention.
- Describe well control equipment for wireline, coiled tubing, snubbing and workover operations.
- Specify equipment testing and certification requirements.
- Apply shut-in procedures for each intervention method.
- Select and execute kill methods, including bullheading, lubricate and bleed, and circulating kills.
- Design kill fluids and calculate kill requirements.
- Manage special problems including gas migration, hydrates and hydrogen sulphide.
- Apply emergency response procedures and post-incident requirements.
Organisations sending participants to this training will:
- Reduce the likelihood and consequence of well control incidents in live well work.
- Improve barrier discipline and equipment testing practice.
- Improve well-specific kill planning in intervention programmes.
- Strengthen crew competence and emergency preparedness.
- Meet regulatory and certification requirements for well control competence.
Participants will:
- Understand well control principles as they apply to live wells.
- Be able to recognise early warning signs during intervention.
- Know the pressure control equipment for each method and its limits.
- Be able to select and execute an appropriate kill method.
- Be prepared to act correctly in a well control emergency.
- Well intervention and workover engineers
- Production engineers
- Operations engineers and supervisors
- Well services supervisors and crews
- Completion engineers
- Field supervisors responsible for live well operations
Module 1: Pressure Fundamentals
- Hydrostatic, formation and fracture pressure
- Pressure gradients and equivalent densities
- Reservoir pressure and drawdown
- Pressure in gas-filled and liquid-filled wells
Module 2: Barriers in Live Well Operations
- Two-barrier principle
- Primary and secondary barriers during intervention
- Barrier verification before and during the job
- Barrier failure scenarios
Module 3: Kick Causes and Detection
- Causes during production operations
- Causes during wireline, coiled tubing and snubbing work
- Causes during workover and kill operations
- Warning signs and monitoring
- Well-specific baseline data
Module 4: Well Control Equipment
- Wireline pressure control stacks
- Coiled tubing blowout preventers and strippers
- Snubbing stacks and rams
- Workover blowout preventer stacks
- Check valves and downhole barriers
- Testing, certification and maintenance
Module 5: Shut-In Procedures
- Shut-in procedures by intervention method
- Hard and soft shut-in considerations
- Actions with tools or pipe in the hole
- Recording and interpreting shut-in pressures
Module 6: Kill Methods
- Bullheading
- Lubricate and bleed
- Circulating kill methods
- Forward and reverse circulation
- Selecting the method for the well and situation
Module 7: Kill Fluids and Calculations
- Kill fluid density calculations
- Fluid selection and formation compatibility
- Volume and pumping requirements
- Losses and their management
- Underbalanced alternatives
Module 8: Special Problems
- Gas migration in a shut-in well
- Hydrate formation during kills
- Hydrogen sulphide operations
- High pressure and high temperature wells
- Stuck pipe and tools during a well control event
Module 9: Emergency Response and Incident Management
- Roles, responsibilities and authority
- Emergency procedures and drills
- Escalation and notification
- Bridging documents with contractors
- Post-incident investigation and reporting
Upon successful completion of this training course, delegates will be awarded an official Certificate of Completion issued by the Petroleum Engineers Association (PEA), an ISO 9001:2015 certified training organization. The certificate carries 10 Credits and formally records the total learning hours completed.
Each certificate is signed by the Course Facilitator and the CEO of the Petroleum Engineers Association, and serves as verifiable proof of professional training that delegates can present to employers and professional bodies worldwide.
Frequently Asked Questions
All course bookings made through PEA are strictly non-refundable. By registering for a course, you acknowledge and accept that all fees are payable in full and are not subject to refund under any circumstances, including changes in personal or professional commitments or partial attendance.
PEA reserves the right to make reasonable adjustments to course content, trainers, or schedules where necessary, without entitling delegates to a refund. Comprehensive details of each course — including objectives, target audience, and content — are clearly outlined before enrolment, and it is the responsibility of the delegate to ensure the course's suitability prior to booking.
For any inquiries related to cancellations or bookings, please contact our support team, who will be happy to assist you.