Re-entry, Slot Recovery & Well Reuse Planning
Have Questions ?
Re-entry, Slot Recovery & Well Reuse Planning - DC-RSR-PEA27
| Code | Date | Time | Duration | Location | Currency | Early Bird Fee Per Person |
|---|---|---|---|---|---|---|
| DC-RSR-PEA27 | 09 - 13 Aug 2027 | 10 AM CST | 4 Hours / Day |
Online |
USD |
3500 |
Need this for a group? We deliver the same course in-house — face-to-face at your location or online — tailored to your assets and team level. Contact info@peassociations.com
Boost your team's skills and your budget! Enjoy group discounts for collaborative learning. Send an inquiry to info@peassociations.com.
Re-entry, Slot Recovery & Well Reuse Planning
This course covers re-entry, slot recovery and well reuse. Participants study candidate screening, well and integrity assessment, data gathering from old wells, re-entry planning and operations, casing recovery and cutting, slot recovery methods, whipstock and sidetrack options, regulatory requirements, cost comparison and risk assessment.
Description
Existing wells and slots are assets. Re-entering a well to sidetrack to a new target, recovering a slot on a platform where space is fixed, or reusing a wellbore for injection or monitoring can be far cheaper than drilling a new well, provided the old well is in a condition that allows it.
This course covers the assessment and the work. It starts with candidate screening and the reasons for re-entry, then covers well and integrity assessment: records review, casing and cement condition, annulus pressures and the barriers that exist or must be created. It covers data gathering from old wells, including logging through tubing and casing inspection. The planning sections cover re-entry operations, tubing and completion recovery, casing cutting and recovery, slot recovery methods including full and partial recovery, and whipstock and sidetrack options from an existing wellbore. The course closes with regulatory requirements, cost comparison against a new well, and the risk assessment that determines whether re-entry is sensible.
The decision rests on condition. A well with sound casing, verified cement and accessible annuli is a cheap platform for a sidetrack; one with sustained casing pressure, corroded casing and no reliable records is a liability that can consume more rig time than drilling a new well, and can end with an abandonment instead of a producer.
Records are often the limiting factor. Wells drilled decades ago may have incomplete casing tallies, missing cement records, undocumented repairs and surveys on obsolete references. Rebuilding the picture from what exists, and logging to fill the gaps, is the first real task in any re-entry project.
Slot recovery on platforms is driven by space rather than by the well. Where every slot is occupied and new targets remain, recovering a slot from a depleted or failed well is the only way to drill, and the work, including cutting and pulling casing strings and preparing the slot, has to be planned as a project in itself.
By the end of this training, participants will be able to:
- Screen re-entry and slot recovery candidates against objectives.
- Assess well and integrity condition from records and measurements.
- Gather and interpret data from old wells, including through-tubing logging.
- Identify existing barriers and plan the barriers required for re-entry.
- Plan re-entry operations, including tubing and completion recovery.
- Plan casing cutting and recovery operations.
- Select slot recovery methods and plan the sequence.
- Plan whipstock and sidetrack options from an existing wellbore.
- Apply regulatory requirements for re-entry and reuse.
- Compare costs and assess risks against drilling a new well.
The course is instructor-led. Participants assess real re-entry candidates from well records, logs and integrity data, decide whether re-entry is viable and plan the operation. Cases cover successful slot recoveries and projects that were abandoned part way, with the reasons. Participants are encouraged to bring their own candidate wells for discussion.
Organisations sending participants to this training will:
- Reuse existing wells and slots where it is cheaper than new drilling.
- Avoid re-entry projects that will fail on well condition.
- Improve assessment of old wells before committing rig time.
- Recover slots on constrained platforms.
- Meet regulatory requirements for well reuse.
Participants will:
- Be able to screen and assess re-entry candidates.
- Be able to rebuild the picture of an old well from records and logs.
- Be able to plan re-entry and recovery operations.
- Understand slot recovery methods and their sequence.
- Be able to compare re-entry against new drilling on cost and risk.
- Drilling and well engineers
- Well intervention and workover engineers
- Well integrity engineers
- Field development engineers on mature assets
- Platform operations engineers
- Technical authorities reviewing reuse proposals
Module 1: Reasons and Candidate Screening
- Re-entry for new targets
- Slot recovery on constrained platforms
- Conversion to injection or monitoring
- Screening criteria
- Alternatives and when to reject a candidate
Module 2: Well and Integrity Assessment
- Records review and gap identification
- Casing and cement condition
- Annulus pressure history
- Existing barriers
- Integrity acceptance criteria for re-entry
Module 3: Data Gathering
- Logging through tubing
- Casing inspection logging
- Cement evaluation in old wells
- Pressure testing
- Building a current well schematic
Module 4: Re-Entry Planning
- Objectives and scope definition
- Barrier plan for the operation
- Rig and equipment selection
- Well control considerations
- Programme preparation
Module 5: Completion and Tubing Recovery
- Killing the well safely
- Pulling tubing and completion equipment
- Stuck completion recovery
- Scale, sand and debris problems
- Cleaning the wellbore
Module 6: Casing Cutting and Recovery
- Cutting methods and tool selection
- Casing recovery operations
- Stuck casing and contingency
- Section milling as an alternative
- Handling recovered tubulars
Module 7: Slot Recovery
- Full and partial slot recovery
- Conductor and surface casing recovery
- Slot preparation for a new well
- Platform constraints and simultaneous operations
- Sequencing within a campaign
Module 8: Sidetracking from Existing Wells
- Kick-off point selection in an old well
- Whipstock and window milling in aged casing
- Cement plug options
- Directional planning from the existing trajectory
- Casing and completion design for the new hole
Module 9: Regulation, Cost and Risk
- Regulatory requirements for re-entry and reuse
- Barrier and verification requirements
- Cost comparison with a new well
- Risk assessment and contingency
- Decision criteria and approval
Upon successful completion of this training course, delegates will be awarded an official Certificate of Completion issued by the Petroleum Engineers Association (PEA), an ISO 9001:2015 certified training organization. The certificate carries 10 Credits and formally records the total learning hours completed.
Each certificate is signed by the Course Facilitator and the CEO of the Petroleum Engineers Association, and serves as verifiable proof of professional training that delegates can present to employers and professional bodies worldwide.
Frequently Asked Questions
All course bookings made through PEA are strictly non-refundable. By registering for a course, you acknowledge and accept that all fees are payable in full and are not subject to refund under any circumstances, including changes in personal or professional commitments or partial attendance.
PEA reserves the right to make reasonable adjustments to course content, trainers, or schedules where necessary, without entitling delegates to a refund. Comprehensive details of each course — including objectives, target audience, and content — are clearly outlined before enrolment, and it is the responsibility of the delegate to ensure the course's suitability prior to booking.
For any inquiries related to cancellations or bookings, please contact our support team, who will be happy to assist you.