Zonal Isolation & Annular Barrier Verification
Have Questions ?
Zonal Isolation & Annular Barrier Verification - DC-ZIB-PEA27
| Code | Date | Time | Duration | Location | Currency | Early Bird Fee Per Person |
|---|---|---|---|---|---|---|
| DC-ZIB-PEA27 | 19 - 23 Apr 2027 | 10 AM CST | 4 Hours / Day |
Online |
USD |
3500 |
Need this for a group? We deliver the same course in-house — face-to-face at your location or online — tailored to your assets and team level. Contact info@peassociations.com
Boost your team's skills and your budget! Enjoy group discounts for collaborative learning. Send an inquiry to info@peassociations.com.
Zonal Isolation & Annular Barrier Verification
This course covers zonal isolation and the verification of annular barriers. Participants study isolation requirements and standards, barrier definition in the annulus, cement and mechanical isolation options, verification methods and acceptance criteria, pressure testing, logging evidence, swellable and alternative barriers, remediation and documentation.
Description
Zonal isolation is the requirement that fluids cannot move between formations, or to surface, outside the casing. It is created by cement or by mechanical barriers, and it must be verified, not assumed, because regulators, integrity standards and abandonment requirements all treat an unverified annular barrier as no barrier at all.
This course covers the requirement and the proof. It starts with isolation objectives, regulatory and standards requirements, and what constitutes an acceptable annular barrier. It then covers the options: primary cement, remedial cement, swellable packers, mechanical annular barriers and alternative sealing materials, with their performance and limitations. The verification sections cover pressure testing methods, cement evaluation logging as evidence, temperature and noise surveys, annulus pressure monitoring and the acceptance criteria that determine whether a barrier passes. The course closes with managing failed verification, remediation options, barrier documentation and the use of verified barriers in integrity and abandonment plans.
Standards define an annular barrier as a seal extending across the full cross-section of the annulus, of defined length, verified by an accepted method. In practice that means cement of adequate length and quality, confirmed by logging and, where possible, pressure testing. A log alone shows what is there; a pressure test shows whether it holds; the combination is what most frameworks accept.
Mechanical barriers have become a practical alternative where cement is difficult. Swellable packers, expandable systems and annular packers can create isolation in open hole or behind casing, and in some cases can be verified more directly than cement. They have their own limits, particularly around swell time, fluid compatibility and pressure capacity.
The documentation matters as much as the barrier. An annular barrier accepted ten years ago with no record of its verification is an integrity problem waiting to appear during abandonment planning. Recording what was verified, by what method, against what criteria, is part of creating the barrier.
By the end of this training, participants will be able to:
- Define zonal isolation requirements from regulations and standards.
- Specify what constitutes an acceptable annular barrier.
- Compare cement and mechanical isolation options and their limits.
- Design cement barriers to meet length and quality requirements.
- Specify swellable, expandable and alternative annular barriers.
- Design verification programmes using pressure testing and logging.
- Apply acceptance criteria to verification results.
- Use annulus pressure monitoring and surveys as supporting evidence.
- Plan remediation when verification fails.
- Document verified barriers for integrity and abandonment purposes.
The course is instructor-led. Isolation requirements are taken from recognised standards and applied to real well cases, with participants defining barriers, specifying verification and assessing whether evidence meets acceptance criteria. Cases include barriers accepted on inadequate evidence and the consequences. Participants are encouraged to bring their own well schematics for discussion.
Organisations sending participants to this training will:
- Create annular barriers that meet regulatory and standards requirements.
- Verify barriers properly rather than assuming them.
- Reduce integrity anomalies arising from unverified isolation.
- Reduce abandonment cost by having documented barriers in place.
- Improve consistency of isolation requirements across wells.
Participants will:
- Understand what an acceptable annular barrier is.
- Be able to design cement and mechanical isolation.
- Be able to specify verification and apply acceptance criteria.
- Be able to assess whether existing evidence is sufficient.
- Be able to document barriers for integrity and abandonment use.
- Well integrity engineers
- Drilling and well engineers
- Completion engineers
- Abandonment and decommissioning engineers
- Regulatory and compliance staff
- Technical authorities for well integrity
Module 1: Isolation Requirements
- Purpose of zonal isolation
- Regulatory requirements by region
- Industry standards and their barrier definitions
- Isolation requirements by well type and phase
Module 2: Defining an Annular Barrier
- Cross-sectional isolation
- Length requirements
- Quality requirements
- Barrier elements and their functions
- Documented acceptance criteria
Module 3: Cement as a Barrier
- Primary cement as the barrier
- Designing for barrier length and placement
- Top of cement determination
- Factors that compromise cement barriers
- Remedial cement as a barrier
Module 4: Mechanical and Alternative Barriers
- Swellable packers
- Expandable systems and annular packers
- Resin and sealant barriers
- Formation creep and shale barriers
- Performance, limits and verification of each
Module 5: Pressure Testing Verification
- Positive and inflow testing
- Test pressure selection
- Isolating the interval to be tested
- Test duration and acceptance
- Interpreting marginal results
Module 6: Logging Verification
- Cement evaluation logs as barrier evidence
- Coverage and azimuthal requirements
- Combining log types
- Limits of logging as sole evidence
- Logging through tubing for existing wells
Module 7: Supporting Evidence
- Annulus pressure monitoring
- Temperature and noise surveys
- Tracer and sampling methods
- Production and injection behaviour
- Building a verification case from multiple sources
Module 8: Failed Verification and Remediation
- Interpreting failed tests
- Remedial options and their likelihood of success
- Re-verification after remediation
- Operating with a known barrier deficiency
- Escalation and risk acceptance
Module 9: Documentation and Use
- Barrier records and schematics
- Verification records and traceability
- Use in well integrity management
- Use in abandonment planning
- Audit and regulatory reporting
Frequently Asked Questions
All course bookings made through PEA are strictly non-refundable. By registering for a course, you acknowledge and accept that all fees are payable in full and are not subject to refund under any circumstances, including changes in personal or professional commitments or partial attendance.
PEA reserves the right to make reasonable adjustments to course content, trainers, or schedules where necessary, without entitling delegates to a refund. Comprehensive details of each course — including objectives, target audience, and content — are clearly outlined before enrolment, and it is the responsibility of the delegate to ensure the course's suitability prior to booking.
For any inquiries related to cancellations or bookings, please contact our support team, who will be happy to assist you.