Upper & Lower Completion Design
Have Questions ?
Upper & Lower Completion Design - DC-ULC-PEA27
| Code | Date | Time | Duration | Location | Currency | Early Bird Fee Per Person |
|---|---|---|---|---|---|---|
| DC-ULC-PEA27 | 15 - 19 Nov 2027 | 10 AM CST | 4 Hours / Day |
Online |
USD |
3000 |
Need this for a group? We deliver the same course in-house — face-to-face at your location or online — tailored to your assets and team level. Contact info@peassociations.com
Boost your team's skills and your budget! Enjoy group discounts for collaborative learning. Send an inquiry to info@peassociations.com.
Upper & Lower Completion Design
This course covers upper and lower completion design as an integrated system. Participants study design basis and architecture, lower completion options including sand control and inflow control, interface equipment and crossovers, upper completion tubing and equipment, isolation and barrier requirements, installation sequence, intervention access and the interaction between the two halves.
Description
Most completions are built in two parts. The lower completion connects the reservoir to the well, through screens, gravel packs, perforated liners or open hole, and is usually installed first. The upper completion carries the produced fluid to surface, with tubing, packer, safety valve and flow control equipment, and is installed afterwards and can be retrieved for workover.
This course covers both and the interface between them. It starts with design basis and completion architecture, then covers lower completion options, including open hole, cased and perforated, screens, gravel packs and inflow control, and the zonal isolation they require. It covers the interface: polished bore receptacles, seal assemblies, crossovers and the clearances that constrain everything above. It then covers upper completion design, including tubing sizing and stress analysis, packers, safety valves and flow control, barrier requirements, the installation sequence for both halves, intervention and workover access, and the consequences of design decisions in one half for the other.
The interface is where completion designs fail. A lower completion installed with a seal bore of a given size fixes the maximum size of everything run through it afterwards, and a seal assembly that does not stab cleanly or a crossover that restricts flow becomes a permanent limitation. Designing the two halves together avoids finding this out during installation.
Retrievability is the reason for the split. The upper completion can be pulled for workover without disturbing the sand control or the reservoir connection, which protects the most difficult and expensive part of the completion. That benefit only exists if the interface is designed to allow clean retrieval and re-entry.
Barriers have to work through both halves. During installation, after installation and during any intervention, the well needs two verified barriers, and the equipment that provides them sits in both the lower and upper completion. Mapping those barriers through each stage of the installation sequence is part of the design rather than a safety case written afterwards.
By the end of this training, participants will be able to:
- Define the completion design basis and select the completion architecture.
- Select lower completion options for the reservoir and well conditions.
- Design zonal isolation within the lower completion.
- Specify the interface equipment between lower and upper completions.
- Size tubing and perform stress analysis for the upper completion.
- Select packers, safety valves and flow control equipment.
- Map barriers through installation, production and intervention.
- Plan the installation sequence for both completion halves.
- Design for intervention and workover access.
- Assess how design choices in one half constrain the other.
The course is instructor-led. Participants design complete two-part completions for given wells, working from reservoir requirements through lower completion selection to upper completion design and installation sequencing. Field cases cover interface failures and completions that could not be retrieved. Participants are encouraged to bring their own designs for discussion.
Organisations sending participants to this training
will:
- Design completions that work as one system rather
than two.
- Avoid interface problems during installation.
- Preserve retrievability and future intervention
options.
- Improve barrier management through installation and operation.
- Reduce completion failures and workovers.
Participants will:
- Understand upper and lower completion design and their interaction.
- Be able to select lower completion and isolation options.
- Be able to design upper completions and size tubing.
- Be able to specify interface equipment correctly.
- Be able to plan installation sequences and barrier states.
- Completion engineers
- Drilling and well engineers
- Production engineers involved in well design
- Well intervention engineers
- Service company completion engineers
- Graduate engineers in well engineering
Module 1: Completion Design Basis
- Reservoir and production requirements
- Well life expectations
- Intervention and artificial lift requirements
- Barrier and regulatory requirements
- Architecture selection
Module 2: Lower Completion Options
- Open hole and barefoot completions
- Cased and perforated completions
- Screens and slotted liners
- Gravel packs and frac packs
- Selection by formation and fluid
Module 3: Zonal Isolation in the Lower Completion
- Swell and mechanical packers
- Cemented liners
- Isolation between zones and compartments
- Verification of isolation
- Consequences of isolation failure
Module 4: Inflow Control in the Lower Completion
- Inflow control devices
- Autonomous devices
- Interval control valves
- When inflow control is justified
- Integration with isolation
Module 5: The Interface
- Polished bore receptacles and seal bores
- Seal assemblies and stingers
- Crossovers and restrictions
- Clearance and drift considerations
- Stabbing and space-out
Module 6: Upper Completion Design
- Tubing sizing from well performance
- Tubing stress analysis and load cases
- Materials and connections
- Flow control and circulation devices
- Gas lift and artificial lift provisions
Module 7: Packers, Valves and Equipment
- Packer types and setting
- Subsurface safety valves
- Landing nipples and flow couplings
- Downhole gauges and control lines
- Equipment selection criteria
Module 8: Barriers and Installation Sequence
- Barrier requirements at each stage
- Installation sequence for both halves
- Displacement and clean-up
- Testing and verification
- Handover to production
Module 9: Intervention, Workover and Design Interaction
- Intervention access through the completion
- Retrieving and replacing the upper completion
- Workover planning considerations
- How each half constrains the other
- Design review and verification
Upon successful completion of this training course, delegates will be awarded an official Certificate of Completion issued by the Petroleum Engineers Association (PEA), an ISO 9001:2015 certified training organization. The certificate carries 10 Credits and formally records the total learning hours completed.
Each certificate is signed by the Course Facilitator and the CEO of the Petroleum Engineers Association, and serves as verifiable proof of professional training that delegates can present to employers and professional bodies worldwide.
Frequently Asked Questions
All course bookings made through PEA are strictly non-refundable. By registering for a course, you acknowledge and accept that all fees are payable in full and are not subject to refund under any circumstances, including changes in personal or professional commitments or partial attendance.
PEA reserves the right to make reasonable adjustments to course content, trainers, or schedules where necessary, without entitling delegates to a refund. Comprehensive details of each course — including objectives, target audience, and content — are clearly outlined before enrolment, and it is the responsibility of the delegate to ensure the course's suitability prior to booking.
For any inquiries related to cancellations or bookings, please contact our support team, who will be happy to assist you.