Well Completion Design & Equipment
Have Questions ?
Well Completion Design & Equipment - DC-WCD-PEA27
| Code | Date | Time | Duration | Location | Currency | Early Bird Fee Per Person |
|---|---|---|---|---|---|---|
| DC-WCD-PEA27 | 15 - 19 Nov 2027 | 10 AM CST | 4 Hours / Day |
Online |
USD |
3000 |
Need this for a group? We deliver the same course in-house — face-to-face at your location or online — tailored to your assets and team level. Contact info@peassociations.com
Boost your team's skills and your budget! Enjoy group discounts for collaborative learning. Send an inquiry to info@peassociations.com.
Well Completion Design & Equipment
This course covers the design and installation of production well completions. Participants study completion selection, tubing design and stress analysis, packers, flow control and safety equipment, wellheads and trees, perforating and sand control options, completion fluids, installation practice and completion integrity over well life.
Description
The completion is the permanent link between the reservoir and the surface. It sets how much the well can produce, how it can be lifted, how it can be intervened and how safely it can be operated, and changing it later costs a rig. This course covers the decisions and equipment involved in designing and installing a production completion.
Participants work through the design basis, from reservoir fluids, rates and pressures to sand, corrosion and intervention requirements, and then through completion type selection, tubing sizing and stress analysis, packers and anchors, flow control and safety equipment, wellheads and Christmas trees, and the connection to the reservoir through perforating or sand control. The course also covers completion fluids and formation damage prevention, installation and running practice, and how completion decisions affect integrity, artificial lift and intervention over the life of the well.
A completion is a compromise between production, cost, safety and future flexibility. A large tubing gives high early rates but may not lift fluid later in life. A simple cased and perforated completion is cheap but limits zone control. A monobore completion suits through-tubing intervention but constrains equipment. Every completion in the field is the result of choices like these, and the consequences last for decades.
Tubing design is the mechanical core of the work. Tubing must carry production loads, survive pressure testing, stimulation and shut-in, and absorb temperature-induced length and force changes without exceeding the strength of the pipe or the rating of the packer. Corrosion, erosion and sour service requirements drive material selection, and completions in high pressure or high temperature wells leave very little margin.
Common failures trace to a few causes: designs based on start-up conditions rather than field life, load cases that were never checked, elastomers and metallurgy unsuited to the produced fluids, damage caused by completion fluids and installation practice, and completions that leave no practical way to intervene. This course covers the design process that prevents them.
By the end of this training, participants will be able to:
- Define the design basis for a completion from reservoir, production, safety and intervention requirements.
- Select a completion type and architecture for given well and reservoir conditions.
- Size production tubing for flow, and analyse tubing stresses for the full set of load cases.
- Select packers, anchors and their setting mechanisms.
- Specify flow control, safety valves, nipples and downhole monitoring equipment.
- Select wellhead and Christmas tree equipment and understand pressure rating and sealing.
- Compare perforated, open hole and sand control completion options.
- Specify completion fluids and practices that protect the formation.
- Plan completion installation, testing and commissioning.
- Assess how completion decisions affect integrity, artificial lift and future intervention.
The course is instructor-led. The completion is built from the bottom up, component by component, with worked examples for tubing sizing and stress analysis and for equipment selection. Field cases show where completion designs have succeeded and failed and why. Participants are encouraged to bring their own well conditions and completion problems for discussion.
Organisations sending participants to this training will:
- Get completions designed for the full life of the well, not just for start-up.
- Reduce completion failures, leaks and premature workovers.
- Improve the consistency and documentation of completion design across the asset.
- Preserve future options for artificial lift, stimulation and intervention.
- Reduce formation damage caused during completion operations.
Participants will:
- Understand the function of every component in a production completion.
- Be able to produce and check a completion design.
- Be able to carry out tubing stress analysis for the main load cases.
- Understand how completion choices affect production and intervention over field life.
- Be prepared for advanced completion, sand control and intervention work.
- Completion engineers
- Production engineers
- Drilling engineers involved in well delivery
- Well intervention engineers
- Reservoir engineers involved in well design
- Operations engineers and supervisors
- Graduate engineers in well engineering roles
Module 1: Completion Design Basis
- Reservoir, fluid and production requirements
- Well life expectations and future changes
- Safety, regulatory and integrity requirements
- Intervention and artificial lift requirements
- Cost and rig constraints
Module 2: Completion Types and Architecture
- Open hole, cased and perforated completions
- Single, dual and multi-zone completions
- Monobore and conventional completions
- Tubingless and concentric completions
- Selection criteria
Module 3: Tubing Selection and Sizing
- Tubing size selection from well performance
- Tubing grades, weights and connections
- Material selection for corrosive and sour service
- Erosion limits
Module 4: Tubing Stress Analysis
- Load cases: installation, testing, production,
injection, stimulation and shut-in
- Temperature and pressure effects on tubing length and
force
- Piston, ballooning, buckling and thermal effects
- Packer forces and tubing movement
- Design factors and acceptance criteria
Module 5: Packers and Anchors
- Permanent, retrievable and hydraulic set packers
- Setting mechanisms and sealing
- Packer selection and rating
- Tubing-to-packer connections and seal assemblies
Module 6: Flow Control and Safety Equipment
- Landing nipples and flow couplings
- Sliding sleeves and circulation devices
- Subsurface safety valves and control lines
- Gas lift mandrels and lift equipment provisions
- Downhole gauges and control lines
Module 7: Wellheads and Christmas Trees
- Casing and tubing heads and hangers
- Christmas tree configurations
- Pressure ratings, seals and testing
- Surface safety valves and control systems
Module 8: Reservoir Connection
- Perforated completions and perforating requirements
- Open hole and slotted liner completions
- Sand control options
- Zonal isolation
Module 9: Completion Fluids and Formation Protection
- Brines and completion fluid selection
- Filtration and cleanliness
- Formation damage during completion
- Displacement and wellbore clean-up
Module 10: Installation, Testing and Life-of-Well
Integrity
- Running and setting the completion
- Pressure testing and commissioning
- Documentation and as-built records
- Completion integrity over well life
- Workover and recompletion considerations
Upon successful completion of this training course, delegates will be awarded an official Certificate of Completion issued by the Petroleum Engineers Association (PEA), an ISO 9001:2015 certified training organization. The certificate carries 10 Credits and formally records the total learning hours completed.
Each certificate is signed by the Course Facilitator and the CEO of the Petroleum Engineers Association, and serves as verifiable proof of professional training that delegates can present to employers and professional bodies worldwide.
Frequently Asked Questions
All course bookings made through PEA are strictly non-refundable. By registering for a course, you acknowledge and accept that all fees are payable in full and are not subject to refund under any circumstances, including changes in personal or professional commitments or partial attendance.
PEA reserves the right to make reasonable adjustments to course content, trainers, or schedules where necessary, without entitling delegates to a refund. Comprehensive details of each course — including objectives, target audience, and content — are clearly outlined before enrolment, and it is the responsibility of the delegate to ensure the course's suitability prior to booking.
For any inquiries related to cancellations or bookings, please contact our support team, who will be happy to assist you.