Artificial Lift Economics & Lifecycle Cost
Have Questions ?
Artificial Lift Economics & Lifecycle Cost - PE-ALE-PEA27
| Code | Date | Time | Duration | Location | Currency | Early Bird Fee Per Person |
|---|---|---|---|---|---|---|
| PE-ALE-PEA27 | 14 - 18 Jun 2027 | 10 AM CST | 4 Hours Per Day |
Online |
USD |
3500 |
Need this for a group? We deliver the same course in-house — face-to-face at your location or online — tailored to your assets and team level. Contact info@peassociations.com.
Boost your team's skills and your budget! Enjoy group discounts for collaborative learning. Send an inquiry to info@peassociations.com.
Artificial Lift Economics & Lifecycle Cost
Description
Artificial lift decisions are economic decisions. The method chosen sets capital cost, energy consumption, intervention frequency and the production that is deferred whenever the well is down. A method that is cheaper to install can easily cost more over five years than one that costs twice as much upfront. This course gives production engineers the tools to make and present that comparison.
The course covers the cost elements of each lift method, from equipment and installation through energy, chemicals, maintenance, workovers and deferred production, and how to model them over the life of the well. It then covers lifecycle cost comparison between methods, economic evaluation of conversions, optimisation projects and run life improvement programmes, and the discounted cash flow measures used to rank them. It closes with how to build and present an artificial lift business case, including uncertainty and sensitivity.
In a mature field, artificial lift is usually the largest single controllable item in the operating cost of a well, and lift failures are usually the largest single source of deferred production. Yet lift decisions are often made on equipment price alone, because that is the number that appears in a tender, while energy, workover and deferment costs are spread across other budgets.
Lifecycle cost analysis puts these numbers together. It combines capital cost, installation, energy, chemicals, surveillance, maintenance, workover cost and the value of production lost during downtime, and expresses them as cost per barrel lifted over the life of the well. On that basis, run life is often worth more than equipment price: a pump that runs three years instead of one changes field economics more than a discount on the pump.
Common weaknesses in artificial lift economics include ignoring deferment, using generic rather than field-specific failure rates, comparing methods over different time horizons, and leaving energy cost out entirely. Presenting a lift case without these numbers usually means the cheapest tender wins, which is rarely the cheapest outcome.
By the end of this training, participants will be able to:
- Identify the full cost elements of each artificial lift method over its life.
- Estimate energy consumption and cost for each lift method.
- Quantify workover cost and deferred production from run life and failure rates.
- Build a lifecycle cost model and calculate cost per barrel lifted.
- Compare artificial lift methods on a consistent economic basis.
- Evaluate the economics of lift conversions and upgrades.
- Evaluate optimisation and run life improvement projects using discounted cash flow measures.
- Carry out sensitivity analysis on the main cost and production assumptions.
- Prepare and present an artificial lift business case for approval.
Organisations sending participants to this training will:
- Base artificial lift decisions on lifecycle cost rather than equipment price.
- Reduce total lifting cost per barrel across the field.
- Justify run life improvement and optimisation spend with credible numbers.
- Improve the quality of lift business cases going to management.
- Make energy and deferment costs visible in lift decisions.
Participants will:
- Understand the full cost structure of every major lift method.
- Be able to build a lifecycle cost model and calculate cost per barrel.
- Be able to evaluate conversions and optimisation projects economically.
- Be able to run sensitivities and present results with their uncertainty.
- Be able to make a persuasive, numbers-based case for lift decisions.
- Production engineers
- Artificial lift engineers
- Production and operations managers
- Planning and economics staff working with producing assets
- Asset and field development engineers
- Procurement staff involved in lift equipment contracts
Module 1: Cost Structure of Artificial Lift
- Capital and installation cost
- Energy cost
- Chemicals, maintenance and surveillance cost
- Workover and intervention cost
- Deferred production
Module 2: Energy Consumption by Lift Method
- Energy requirements of rod pumps, ESPs, gas lift, PCPs and hydraulic pumps
- System efficiency
- Compression cost for gas lift
- Measuring and reducing energy use
Module 3: Run Life, Failure Rates and Downtime
- Measuring run life and failure frequency
- Cost of a workover by well type
- Deferred production during downtime and restart
- Field failure data and its quality
Module 4: Building a Lifecycle Cost Model
- Model structure and time horizon
- Production profile and decline
- Cost escalation and discounting
- Cost per barrel lifted
Module 5: Comparing Lift Methods
- Consistent comparison basis
- Sensitivity to run life and energy price
- Comparing over changing well conditions
- Presenting comparisons clearly
Module 6: Conversions and Upgrades
- When conversion is justified
- Cost of conversion
- Production gain estimation
- Payback and net present value of conversions
Module 7: Optimisation and Improvement Projects
- Economics of gas lift optimisation
- Economics of run life improvement programmes
- Surveillance and automation investment
- Ranking projects by value
Module 8: Business Cases and Decision Making
- Discounted cash flow measures used in lift decisions
- Uncertainty and sensitivity analysis
- Structuring the business case
- Presenting to management and finance
Upon successful completion of this training course, delegates will be awarded an official Certificate of Completion issued by the Petroleum Engineers Association (PEA), an ISO 9001:2015 certified training organization. The certificate carries 10 Credits and formally records the total learning hours completed.
Each certificate is signed by the Course Facilitator and the CEO of the Petroleum Engineers Association, and serves as verifiable proof of professional training that delegates can present to employers and professional bodies worldwide.
Frequently Asked Questions
All course bookings made through PEA are strictly non-refundable. By registering for a course, you acknowledge and accept that all fees are payable in full and are not subject to refund under any circumstances, including changes in personal or professional commitments or partial attendance.
PEA reserves the right to make reasonable adjustments to course content, trainers, or schedules where necessary, without entitling delegates to a refund. Comprehensive details of each course — including objectives, target audience, and content — are clearly outlined before enrolment, and it is the responsibility of the delegate to ensure the course's suitability prior to booking.
For any inquiries related to cancellations or bookings, please contact our support team, who will be happy to assist you.