Stimulation Candidate Selection & Economics
Have Questions ?
Stimulation Candidate Selection & Economics - PE-SCE-PEA27
| Code | Date | Time | Duration | Location | Currency | Early Bird Fee Per Person |
|---|---|---|---|---|---|---|
| PE-SCE-PEA27 | 04 - 08 Oct 2027 | 10 AM CST | 4 Hours Per Day |
Online |
USD |
3500 |
Need this for a group? We deliver the same course in-house — face-to-face at your location or online — tailored to your assets and team level. Contact info@peassociations.com.
Boost your team's skills and your budget! Enjoy group discounts for collaborative learning. Send an inquiry to info@peassociations.com.
Stimulation Candidate Selection & Economics
Description
Stimulation budgets are always smaller than the list of wells that could be treated. The value of a stimulation programme therefore depends less on treatment design than on picking the right wells, treating them with the right method and being honest about the production gain and its uncertainty. This course covers that selection and justification process.
Participants work through the diagnosis of underperformance, separating near-wellbore damage from reservoir limits, completion restrictions and lift problems, and the estimation of production potential from well tests, offset wells and analytical methods. The course then covers screening criteria for matrix acidising, fracturing and mechanical remedies, treatment cost estimation, economic evaluation using discounted cash flow measures, risk and success probability, portfolio ranking under budget constraints, and the tracking of results to improve future selection.
The single biggest determinant of stimulation programme value is candidate selection. A well with high skin, healthy reservoir pressure and good remaining reserves will pay back a treatment many times over. A well with low reservoir pressure, a watered-out zone or a tubing constraint will not, no matter how well the treatment is designed. Yet candidate lists are often built from whichever wells are producing least, which correlates with the reservoir far more than with damage.
A sound selection process starts with diagnosis. Skin from a well test, productivity compared with offsets, production logs showing which zones contribute and a check that the constraint is not in the tubing or the lift system will usually distinguish damaged wells from depleted ones. The next step is estimating what a successful treatment would deliver and how long the gain would last, since a gain that declines in three months is worth far less than the same gain sustained for three years.
Economics ties it together. Treatment cost, expected gain, decline of the gain, probability of success and the cost of failure define the expected value, and ranking on expected value within the budget maximises the return of the programme. Tracking outcomes against predictions is what makes the next year's selection better. This course covers the full cycle.
By the end of this training, participants will be able to:
- Diagnose the cause of well underperformance and separate damage from reservoir and mechanical limits.
- Estimate the production potential of a well from test, offset and analytical data.
- Apply screening criteria to select between matrix acidising, fracturing and mechanical remedies.
- Estimate treatment cost, including services, deferment and associated intervention.
- Forecast post-treatment production and the decline of the gain.
- Evaluate treatments using payback, net present value and rate of return.
- Assign success probabilities and evaluate expected value.
- Rank a portfolio of candidates under budget and rig constraints.
- Present stimulation programme proposals for approval.
- Track treatment outcomes and use them to improve future candidate selection.
Organisations sending participants to this training will:
- Increase the production gained per unit of stimulation spend.
- Reduce treatments on wells that were never good candidates.
- Improve the credibility of stimulation programme proposals.
- Build a consistent, documented candidate screening process.
- Learn systematically from treatment outcomes.
Participants will:
- Be able to diagnose why a well is underperforming.
- Be able to estimate realistic production gains from stimulation.
- Be able to evaluate treatments economically and rank candidates.
- Be able to present a stimulation programme with credible numbers.
- Be able to track and learn from results.
- Production engineers
- Stimulation and well services engineers
- Well intervention and workover planners
- Reservoir engineers supporting well work
- Production and operations managers
- Planning and economics staff working with producing assets
Module 1: Why Wells Underperform
- Near-wellbore damage
- Reservoir and pressure limits
- Completion and perforation restrictions
- Tubing, lift and surface constraints
- Separating the causes
Module 2: Diagnosis and Data
- Skin from well tests
- Productivity comparison with offset wells
- Production logs and zonal contribution
- Water and deposit analysis
- Well history review and data quality
Module 3: Production Potential Estimation
- Ideal productivity and damage-free rate
- Expected gain from skin removal
- Gain from fracture stimulation
- Limits imposed by outflow and facilities
Module 4: Treatment Screening
- Matrix acidising candidate criteria
- Fracturing candidate criteria
- Mechanical and completion remedies
- Cases where stimulation is not the answer
- Screening workflow and documentation
Module 5: Treatment Cost Estimation
- Service and materials cost
- Rig, coiled tubing and intervention cost
- Deferred production during treatment
- Contingency and failure cost
Module 6: Production Forecasting After Treatment
- Post-treatment rate and decline behaviour
- Duration of the gain
- Incremental versus accelerated production
- Effect on reserves
Module 7: Economic Evaluation
- Payback, net present value and rate of return
- Incremental cash flow construction
- Price and cost assumptions
- Comparing treatment options for one well
Module 8: Risk, Uncertainty and Portfolio Ranking
- Probability of success from field history
- Expected value calculations
- Sensitivity analysis
- Ranking candidates under budget and rig constraints
- Programme scheduling
Module 9: Proposal and Performance Tracking
- Structuring a stimulation programme proposal
- Presenting to management
- Measuring actual against predicted results
- Updating success rates and screening criteria
- Continuous improvement of the programme
Upon successful completion of this training course, delegates will be awarded an official Certificate of Completion issued by the Petroleum Engineers Association (PEA), an ISO 9001:2015 certified training organization. The certificate carries 10 Credits and formally records the total learning hours completed.
Each certificate is signed by the Course Facilitator and the CEO of the Petroleum Engineers Association, and serves as verifiable proof of professional training that delegates can present to employers and professional bodies worldwide.
Frequently Asked Questions
All course bookings made through PEA are strictly non-refundable. By registering for a course, you acknowledge and accept that all fees are payable in full and are not subject to refund under any circumstances, including changes in personal or professional commitments or partial attendance.
PEA reserves the right to make reasonable adjustments to course content, trainers, or schedules where necessary, without entitling delegates to a refund. Comprehensive details of each course — including objectives, target audience, and content — are clearly outlined before enrolment, and it is the responsibility of the delegate to ensure the course's suitability prior to booking.
For any inquiries related to cancellations or bookings, please contact our support team, who will be happy to assist you.