Mature Field Production Optimization
Have Questions ?
Mature Field Production Optimization - PE-MFP-PEA27
| Code | Date | Time | Duration | Location | Currency | Early Bird Fee Per Person |
|---|---|---|---|---|---|---|
| PE-MFP-PEA27 | 26 - 30 Jul 2027 | 10 AM CST | 4 Hours Per Day |
Online |
USD |
3500 |
Need this for a group? We deliver the same course in-house — face-to-face at your location or online — tailored to your assets and team level. Contact info@peassociations.com.
Boost your team's skills and your budget! Enjoy group discounts for collaborative learning. Send an inquiry to info@peassociations.com.
Mature Field Production Optimization
Description
Most producing fields in the world are mature: reservoir pressure has fallen, water cut is high, wells need lift and intervention, and operating cost per barrel is rising towards the economic limit. Yet mature fields often contain large volumes of remaining oil and a long list of opportunities that have never been screened properly, because attention and budget go to new developments.
This course covers how to find and capture that value. It starts with mature field characteristics, decline management and the analysis of where production and reserves have been lost. It then covers the main opportunity categories: water and gas shut-off, well reactivation, recompletion to bypassed zones, stimulation, artificial lift conversion and optimisation, infill drilling and sidetracks, and improved recovery options. The course then covers facility and operating cost debottlenecking, since in a mature field cost reduction is often worth more than production gain, and closes with economic limit analysis, abandonment deferral and the decision about when a field should stop.
A mature field is a portfolio of opportunities and liabilities. On one side are shut-in wells that could be reactivated, zones behind pipe that were never perforated, wells lifting inefficiently, water that could be shut off and facilities running at a fraction of their capacity. On the other are ageing equipment, integrity costs, high water handling loads and an abandonment liability that grows more pressing each year.
The engineering work is mostly screening. There are usually more candidate wells and more possible actions than there is budget, so the value comes from ranking honestly: which reactivations will actually flow, which shut-off jobs will hold, which recompletions have enough remaining saturation behind them. Data is often old and incomplete, so screening in mature fields relies heavily on offset performance, production history and the judgement of people who know the field.
Cost is the other half. Operating cost per barrel rises as rates fall, and a mature field that reduces its cost base extends its life and defers abandonment, which is often worth more than a production project. Facility rationalisation, well count reduction, chemical and energy optimisation and contract renegotiation all belong in the same opportunity list as the production work. This course treats them together.
By the end of this training, participants will be able to:
- Characterise a mature field and analyse its production and pressure history.
- Identify where reserves and production have been lost.
- Screen and rank opportunities across the well and reservoir portfolio.
- Design water and gas shut-off strategies.
- Evaluate well reactivation and recompletion candidates.
- Evaluate artificial lift conversion and optimisation in mature wells.
- Screen infill drilling and sidetrack opportunities.
- Debottleneck facilities and reduce operating cost per barrel.
- Perform economic limit analysis for wells and fields.
- Plan abandonment deferral and field end-of-life strategy.
Organisations sending participants to this training will:
- Identify remaining value in mature assets that would otherwise be missed.
- Extend field life by reducing operating cost per barrel.
- Prioritise limited budget on the highest value opportunities.
- Reduce water handling and energy cost.
- Plan end-of-life and abandonment on an informed basis.
Participants will:
- Understand how mature fields behave and where value remains.
- Be able to screen and rank a large opportunity portfolio.
- Be able to evaluate reactivation, recompletion and shut-off candidates.
- Understand cost reduction as a production strategy.
- Be able to carry out economic limit analysis.
- Production engineers in mature assets
- Reservoir engineers
- Well intervention and workover engineers
- Operations and facilities engineers
- Asset managers and planners
- Economics and planning staff
Module 1: Mature Field Characteristics
- Pressure depletion and rising water cut
- Ageing wells and facilities
- Cost per barrel trends
- Data availability and quality in old fields
Module 2: Analysing Field History
- Production and injection history review
- Pressure and material balance analysis
- Recovery to date and remaining reserves
- Identifying where production was lost
- Well and zone performance mapping
Module 3: Opportunity Identification
- Categories of mature field opportunity
- Screening criteria and data requirements
- Building an opportunity register
- Ranking by value, cost and risk
- Quick wins and campaign work
Module 4: Water and Gas Management
- Sources of unwanted water and gas
- Shut-off options: mechanical and chemical
- Conformance control
- Water handling cost reduction
- Success rates and candidate selection
Module 5: Well Reactivation and Recompletion
- Screening shut-in wells
- Integrity assessment before reactivation
- Recompletion to bypassed zones
- Behind-casing opportunity identification
- Cost and success probability
Module 6: Artificial Lift in Mature Wells
- Lift conversion as rates decline
- Optimising existing lift installations
- Energy cost reduction
- Run life improvement in ageing wells
Module 7: Infill, Sidetracks and Improved Recovery
- Infill well screening
- Sidetrack and re-drill candidates
- Waterflood and improved recovery options
- Screening enhanced recovery methods
Module 8: Facilities and Cost Reduction
- Facility rationalisation and simplification
- Water handling debottlenecking
- Energy and chemical cost reduction
- Manning, maintenance and contract cost
- Well count reduction
Module 9: Economic Limit and End of Life
- Well and field economic limit calculation
- Abandonment liability and timing
- Deferring abandonment through cost reduction
- Divestment considerations
- End-of-life planning
Upon successful completion of this training course, delegates will be awarded an official Certificate of Completion issued by the Petroleum Engineers Association (PEA), an ISO 9001:2015 certified training organization. The certificate carries 10 Credits and formally records the total learning hours completed.
Each certificate is signed by the Course Facilitator and the CEO of the Petroleum Engineers Association, and serves as verifiable proof of professional training that delegates can present to employers and professional bodies worldwide.
Frequently Asked Questions
All course bookings made through PEA are strictly non-refundable. By registering for a course, you acknowledge and accept that all fees are payable in full and are not subject to refund under any circumstances, including changes in personal or professional commitments or partial attendance.
PEA reserves the right to make reasonable adjustments to course content, trainers, or schedules where necessary, without entitling delegates to a refund. Comprehensive details of each course — including objectives, target audience, and content — are clearly outlined before enrolment, and it is the responsibility of the delegate to ensure the course's suitability prior to booking.
For any inquiries related to cancellations or bookings, please contact our support team, who will be happy to assist you.