Integrated Production Modeling & Optimization
Have Questions ?
Integrated Production Modeling & Optimization - PE-IPM-PEA27
| Code | Date | Time | Duration | Location | Currency | Early Bird Fee Per Person |
|---|---|---|---|---|---|---|
| PE-IPM-PEA27 | 22 - 26 Mar 2027 | 10 AM CST | 4 Hours Per Day |
Online |
USD |
3000 |
Need this for a group? We deliver the same course in-house — face-to-face at your location or online — tailored to your assets and team level. Contact info@peassociations.com.
Boost your team's skills and your budget! Enjoy group discounts for collaborative learning. Send an inquiry to info@peassociations.com.
Integrated Production Modeling & Optimization
Description
In a producing field, the reservoir, wells, flowlines and facilities act as one system. A pressure change at the separator changes every well rate; a compressor limit caps gas production; water handling capacity sets how many high water cut wells can flow. Integrated production models link these parts so that engineers can see the effect of any change on the whole field. This course explains how such models are built and used.
The course covers the representation of each part of the system: reservoir models from material balance tanks and decline to coupled simulation, well models, surface networks with pipelines, chokes, manifolds and compressors, and facility constraints. It then covers PVT consistency across the system, history matching of the integrated model, network optimisation including lift gas allocation, choke settings and routing, and forecasting and scenario analysis. The course closes with how integrated models are maintained and governed so they remain useful over field life.
Optimising wells one at a time rarely gives the best result for a field. Increasing rate on one well can raise back-pressure on its neighbours, push water handling over its limit or take lift gas from wells that would use it better. The field optimum is found only when the reservoir, wells and facilities are looked at together.
Integrated production models make this possible. They are used to forecast field production under realistic constraints, test development options such as new wells, compression or debottlenecking, and optimise day-to-day operation through lift gas allocation, choke settings and routing. For many assets they are the main tool linking reservoir management, production operations and facilities planning.
Integrated models are also easy to get wrong. Inconsistent PVT between reservoir and network models, poorly matched well models, missing facility constraints and models that are built once and never updated are common. The result is forecasts that cannot be met and optimisation advice that does not hold in the field. This course focuses on building integrated models that are consistent, calibrated and maintained.
By the end of this training, participants will be able to:
- Explain the purpose, structure and main applications of integrated production models.
- Select a suitable reservoir representation, from material balance to coupled simulation, for a given study.
- Build and calibrate well models for use within an integrated model.
- Model surface networks, including pipelines, manifolds, chokes and compressors.
- Represent facility constraints such as separation, water handling and compression capacity.
- Maintain PVT consistency across reservoir, well and network models.
- History-match an integrated model to field data.
- Optimise field production through lift gas allocation, choke settings and routing.
- Use integrated models to forecast production and evaluate development scenarios.
Organisations sending participants to this training will:
- Get field-level production forecasts that respect real facility constraints.
- Improve day-to-day production through system-wide optimisation of lift gas, chokes and routing.
- Evaluate development and debottlenecking options with better information.
- Improve alignment between reservoir, production and facilities teams.
- Put consistent integrated modelling standards and governance in place.
Participants will:
- Understand how reservoir, wells and facilities interact as one production system.
- Be able to build and calibrate each part of an integrated model.
- Be able to run network optimisation and interpret the results.
- Be able to use integrated models for forecasting and scenario studies.
- Be able to judge the credibility of integrated model results.
- Production engineers
- Reservoir engineers
- Production optimisation engineers
- Facilities and process engineers
- Integrated asset modelling specialists
- Asset development and planning engineers
- Engineers moving into integrated asset team roles
Module 1: Integrated Production Modelling Concepts
- The field as a production system
- Applications: forecasting, optimisation and development planning
- Levels of integration and model structure
Module 2: Reservoir Representation
- Material balance tank models
- Decline and lookup-table representations
- Coupling to reservoir simulation
- Selecting the right representation for the study
Module 3: Well Models in an Integrated System
- Inflow and outflow models
- Artificial lift wells
- Calibration to well tests
Module 4: Surface Network Modelling
- Pipelines and flowlines
- Manifolds and gathering systems
- Chokes and control valves
- Compressors and pumps
Module 5: Facility Constraints
- Separation capacity
- Water handling and injection limits
- Gas compression and export limits
- Representing constraints in the model
Module 6: PVT Consistency
- Black oil and compositional descriptions across the system
- Matching PVT between reservoir and network
- Mixing of fluids from different wells and reservoirs
Module 7: History Matching the Integrated Model
- Data for history matching
- Matching pressures, rates and constraints
- Diagnosing mismatches
Module 8: Network Optimisation
- Lift gas allocation
- Choke optimisation
- Routing and well prioritisation
- Optimisation objectives and constraints
Module 9: Forecasting and Scenario Analysis
- Production forecasting under constraints
- Evaluating new wells, compression and debottlenecking
- Uncertainty in integrated forecasts
Module 10: Model Maintenance and Governance
- Updating models with new data
- Version control and documentation
- Using integrated models in routine operations
Upon successful completion of this training course, delegates will be awarded an official Certificate of Completion issued by the Petroleum Engineers Association (PEA), an ISO 9001:2015 certified training organization. The certificate carries 10 Credits and formally records the total learning hours completed.
Each certificate is signed by the Course Facilitator and the CEO of the Petroleum Engineers Association, and serves as verifiable proof of professional training that delegates can present to employers and professional bodies worldwide.
Frequently Asked Questions
All course bookings made through PEA are strictly non-refundable. By registering for a course, you acknowledge and accept that all fees are payable in full and are not subject to refund under any circumstances, including changes in personal or professional commitments or partial attendance.
PEA reserves the right to make reasonable adjustments to course content, trainers, or schedules where necessary, without entitling delegates to a refund. Comprehensive details of each course — including objectives, target audience, and content — are clearly outlined before enrolment, and it is the responsibility of the delegate to ensure the course's suitability prior to booking.
For any inquiries related to cancellations or bookings, please contact our support team, who will be happy to assist you.