Gas Lift Design & Optimization Using MS Excel
Have Questions ?
Gas Lift Design & Optimization Using MS Excel - PE-GL-EXCEL-PEA27
| Code | Date | Time | Duration | Location | Currency | Early Bird Fee Per Person |
|---|---|---|---|---|---|---|
| PE-GL-EXCEL-PEA27 | 01 - 05 Feb 2027 | 10 AM CST | 4 Hours Per Day |
Online |
USD |
2000 |
Need this for a group? We deliver the same course in-house — face-to-face at your location or online — tailored to your assets and team level. Contact info@peassociations.com.
Boost your team's skills and your budget! Enjoy group discounts for collaborative learning. Send an inquiry to info@peassociations.com.
Gas Lift Design & Optimization Using MS Excel
Description
Gas lift design is a sequence of calculations that suits a spreadsheet well: build the flowing gradient, find the deepest injection point available at the injection pressure, space the unloading valves so they open and close in order, size the ports and set the test rack pressures. Building this in Excel gives engineers a design tool they can check and adapt, and the ability to verify vendor designs.
The course builds the full design workbook and then extends it to optimisation. It starts with fluid properties and gradient calculations, then injection point determination, unloading design and valve spacing, port sizing and valve setting calculations for injection pressure and production pressure operated valves. It then builds gas lift performance curves, optimises injection rate for a single well, and extends to field-wide gas allocation under a compression constraint. The final part builds diagnostic tools: comparing measured gradient surveys against design, identifying multipointing and valve leaks, and screening wells for redesign.
The central gas lift calculation is straightforward: at every depth, compare the pressure available in the casing with the pressure in the tubing, and the injection point is where injection is possible. Everything else, including valve spacing, port sizing and setting pressures, follows from that comparison and from the requirement that each unloading valve closes once the next one starts injecting.
Optimisation is a separate calculation. For a single well, gas lift performance curves show the injection rate that maximises production and the point beyond which additional gas reduces it through friction. Across a field with limited compression, the optimum allocates gas to the wells with the steepest incremental response, which is a constrained optimisation problem that Solver handles well.
Diagnosis completes the picture. Comparing a measured flowing gradient survey against the design shows immediately whether the well is injecting where it should, whether more than one valve is passing gas and whether the operating valve has failed. Participants build that comparison as a working tool during the course.
By the end of this training, participants will be able to:
- Build fluid property and flowing gradient calculations for gas lift wells.
- Determine the deepest achievable injection point for a given injection pressure.
- Design unloading valve spacing and verify the unloading sequence.
- Calculate port sizes and test rack setting pressures for injection and production pressure operated valves.
- Build gas lift performance curves for a well.
- Optimise injection rate for a single well.
- Build field-wide gas allocation optimisation under compression constraints.
- Compare measured gradient surveys with design and diagnose deviations.
- Identify multipointing, valve leaks and insufficient injection pressure from data.
- Screen wells for gas lift redesign and quantify the expected gain.
Organisations sending participants to this training will:
- Verify and improve gas lift designs in-house.
- Increase field production through better gas allocation.
- Diagnose gas lift problems from survey and injection data.
- Identify wells needing redesign as conditions change.
- Reduce dependence on vendor design software for routine work.
Participants will:
- Understand gas lift design calculations in full.
- Be able to design an unloading string and set valve pressures.
- Be able to optimise injection rate for wells and fields.
- Be able to diagnose gas lift wells from gradient survey data.
- Leave with working gas lift design and optimisation workbooks.
- Production engineers
- Artificial lift engineers
- Well operations engineers and supervisors
- Production technologists
- Field engineers responsible for gas lift wells
- Engineers reviewing vendor gas lift designs
Module 1: Gas Lift Calculations Overview
- Design workflow and data requirements
- Injection pressure and gas supply constraints
- Workbook structure and unit control
Module 2: Fluid Properties and Gradients
- Black oil property correlations
- Gas gradient in the annulus
- Flowing gradient in the tubing
- Effect of injected gas on the gradient
- Building the gradient calculation
Module 3: Injection Point Determination
- Casing and tubing pressure profiles
- Transfer pressure and available drawdown
- Deepest injection point calculation
- Effect of injection pressure on production
Module 4: Unloading Design
- Unloading sequence principles
- Valve spacing methods
- Pressure drops between valves
- Verifying that valves close in sequence
- Design safety margins
Module 5: Valve Sizing and Settings
- Injection pressure operated valve force balance
- Production pressure operated valves
- Port size selection
- Test rack setting pressure calculation
- Orifice and venturi valve calculations
Module 6: Gas Lift Performance Curves
- Production against injection rate
- Optimum injection rate
- Effect of water cut, reservoir pressure and tubing size
- Building and plotting performance curves
Module 7: Field-Wide Gas Allocation
- Incremental response of each well
- Compression capacity constraint
- Solver-based allocation optimisation
- Allocation under changing conditions
- Reporting allocation recommendations
Module 8: Diagnostics from Field Data
- Plotting measured gradient surveys against design
- Identifying the actual injection point
- Multipointing and valve leak signatures
- Insufficient injection pressure
- Instability and heading indicators
Module 9: Redesign Screening and Documentation
- Screening wells for redesign
- Quantifying expected gains
- Design documentation and handover
- Validating the finished workbook
Upon successful completion of this training course, delegates will be awarded an official Certificate of Completion issued by the Petroleum Engineers Association (PEA), an ISO 9001:2015 certified training organization. The certificate carries 10 Credits and formally records the total learning hours completed.
Each certificate is signed by the Course Facilitator and the CEO of the Petroleum Engineers Association, and serves as verifiable proof of professional training that delegates can present to employers and professional bodies worldwide.
Frequently Asked Questions
All course bookings made through PEA are strictly non-refundable. By registering for a course, you acknowledge and accept that all fees are payable in full and are not subject to refund under any circumstances, including changes in personal or professional commitments or partial attendance.
PEA reserves the right to make reasonable adjustments to course content, trainers, or schedules where necessary, without entitling delegates to a refund. Comprehensive details of each course — including objectives, target audience, and content — are clearly outlined before enrolment, and it is the responsibility of the delegate to ensure the course's suitability prior to booking.
For any inquiries related to cancellations or bookings, please contact our support team, who will be happy to assist you.